Port of Halifax grain elevator to keep running until at least the end of 2028
HALIFAX - The lease for the grain elevator at the Port of Halifax will be extended at least until the end of 2028.
Original source: Toronto Star
HALIFAX - The lease for the grain elevator at the Port of Halifax will be extended at least until the end of 2028.
Original source: Toronto Star