Global·NewlyNewsCA

LIFT Intersects 26 m at 1.29% Li2O at its BIG East pegmatite, Yellowknife Lithium Project, NWT

CA · · Montreal Gazette

VANCOUVER, British Columbia, May 13, 2026 (GLOBE NEWSWIRE) — Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report results from the 2026 winter program completed at the Yellowknife Lithium Project (“YLP”), located outside the city of Yellowknife, Northwest Territories (Figure 1). This program comprised a total of 17... The post LIFT Intersects 26 m at 1.29% Li2O at its BIG East pegmatite, Yellowknife Lithium Project, NWT appeared first on Montreal Gazette .