AYNA ensures transport of nearly 179,000 passengers during WUF13 in Baku
Within the framework of WUF13, a total of 9 transport hubs, 2 terminal points, and more than 67 intermediate stops were operational.
Original source: Azernews
Within the framework of WUF13, a total of 9 transport hubs, 2 terminal points, and more than 67 intermediate stops were operational.
Original source: Azernews